Project: dhhVolksplane   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:david hawley   -  
Project:   Volksplane VP-1   -   VIEW REPORTS
Total Hours:84
Total Flight Time:3
Total Expense:$6192.70
Start/Last Date:Nov 16, 2018 - No Finish Date
Engine:Volkswagon
 
Friendly URL: https://eaabuilderslog.org?s=dhhVolksplane

Home or Last Project Picture

Nov 20, 2022     Mount Pitch trim control       Category: Empennage
It took 3 hours to drill one hole in the stabilator. Originally I thought the person that fabricated the trim control arm forgot to drill the lower hole. However, I realized while mounting the trim control arm that by not drilling the lower hole I was able to perfectly align top and bottom holes. (of course I did have process of drilling with my standard size bit through 4 inches of material.)


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.